Bio-Syngas Platform

West Biofuels has refined the Fast Internally Circulating Fluidized Bed (FICFB) gasifier based on the original FICFB design developed by the Vienna University of Technology. West Biofuels has developed a gasification system that produces a versatile high-hydrogen syngas ideal for catalytic conversion to renewable natural gas, fuel ethanol, synthetic diesel, or other high-value chemical products.

System Components

System Components

  • Dual Fluidized Bed (Gasifier and Combustion)
  • Bed Material Separation and Return
  • Flue Gas Treatment and Heat Recovery
  • Gas Conditioning and Contaminant Reintroduction
  • Customizable Syngas Conversion (e.g. Engine-Generator, Catalysts, Fischer-Tropsch)

How it works

The FICFB gasifier is a dual fluidized bed gasification system using a synthetic bed material to transfer heat from the combustion zone to the gasification zone. Biomass is fed into the gasification zone via a screw auger where it is thermochemically converted to producer gas through contact with the hot fluidized bed material and steam. The bed material and the remaining char are transported to the combustion side by gravity where air is injected and the char is combusted to heat the bed material. The hot bed material is lifted up the riser with the combustion flue gases into a cyclone where the bed material and flue gases are separated. The re-heated bed material is reintroduced into the fluidized bed gasification chamber while the flue gases continue through the flue gas treatment system. The producer gas, extracted on the gasification side, is conditioned to remove impurities before becoming available to an engine or catalyst system.

Gas Composition
Main Components
H2
35 - 45%
CO
22 - 25%
CH4
~ 10%
C02
20 - 25%
Minor Components
C2H4
2 - 3%
C2H6
0.5%
C3H4
0.4%
O2
< 0.1%
N2
1 - 3%
C6H6
~ 8 g/m3
C7H8
~ 5 g/m3
C10H8
~ 2 g/m3
Tars
20 - 30 mg/m3
Possible Contaminants
H2S
~ 200 mgS/Nm3
COS
~ 5 mgS/Nm3
Mercaptans
~ 30 mgS/Nm3
Thiophens
~ 7 mgS/Nm3
HCI
~ 3 ppm
NH3
500 - 1000 ppm
HCN
~ 100 ppm
Dust
< 20 mg/Nm3
H2:CO
1.7:1 to 2:1
Commercial Deployments
Location
Production
Start Up
Status
Güssing, Austria
2.4 MWel
2002
Operational
Oberwart, Austria
2.8 MWel
2008
Operational
Villach, Austria
3.7 MWel
2010
Operational
Senden/Ulm, Germany
5 MWel
2012
Operational
Göteborg, Sweden
20 MWBioSNG
2014
Operational
Klagenfurt, Austria
5.5 MWel
2016
Planning
Vienna, OMV Austria
30 MWel
2016
Planning